speckit-workflow
适用于 OpenClaw 的完整规范驱动开发 (SDD) 协调器。初始化 SpecKit 并管理整个工程生命周期。
安装 / 下载方式
TotalClaw CLI推荐
totalclaw install totalclaw:totalclaw~vinayakv22-speckit-workflowcURL直接下载,无需登录
curl -fsSL https://skills.taituai.com/api/skills/totalclaw%3Atotalclaw~vinayakv22-speckit-workflow/file -o vinayakv22-speckit-workflow.md## 概述(中文)
适用于 OpenClaw 的完整规范驱动开发 (SDD) 协调器。初始化 SpecKit 并管理整个工程生命周期。
## 原文
# Speckit Workflow Skill 🦞
This is the master orchestrator for the **SpecKit for OpenClaw** engineering workflow.
## ⚠️ Security & Credentials
This workflow is designed to automate git operations to save progress and isolate work.
**Agent Requirement:**
Before starting the workflow or initializing a new project, you **MUST** ask the user:
> "Do you want to enable automated `git commit`, `git push`, and **branch creation** for this project? (Yes/No)"
- **If YES**: Proceed with automated commits, pushes, and branch creation as described in the workflow. Ensure you have write access.
- **If NO**: You **MUST NOT** perform any git operations (commits, pushes, or branch creation). You will only write files locally. The user is responsible for version control.
## 🚀 Step 1: Initialization
If this project has not been initialized with SpecKit yet, you **MUST** ensure the `.specify/` directory is present in the project root.
**Initialization Instructions for Agent:**
1. **Ask for Git Permission** (see above).
2. Check if `.specify/` exists in the project root.
3. If missing, copy the `.specify/` directory from this skill package (located at `./.specify/`) to `.specify/` in the project root.
- Create the destination directory if it doesn't exist.
4. Confirm successful initialization.
---
## 🔄 Resuming Workflow
Before starting or when returning to a project, you **MUST** determine the current state by checking for the existence of SpecKit artifacts:
1. **Check for Initialization**: Verify if `.specify/` exists.
2. **Determine Current Phase**:
- If `.specify/memory/constitution.md` exists -> **Constitution** complete.
- If `specs/<feature>/spec.md` exists -> **Specify** complete.
- If `specs/<feature>/plan.md` exists -> **Plan** complete.
- If `specs/<feature>/tasks.md` exists -> **Tasks** complete.
- If tasks in `tasks.md` are partially marked `[X]` -> **Implementation** in progress.
Always resume from the first incomplete phase in the [Execution Order](#the-execution-order).
---
## 🏗️ Step 2: Workflow Orchestration
Once initialized, you **MUST** follow the canonical Spec-kit order by delegating to sub-agents.
### When to Create a Sub-Agent:
For **each phase** below, you should create or delegate to a specialized sub-agent that uses the corresponding skill found in the `subskills/` directory relative to this skill file (`./subskills/`).
### The Execution Order:
1. 📜 **Constitution**: Delegate to `speckit-constitution`. Establish code quality, testing standards, and architectural constraints.
2. 📝 **Specify**: Delegate to `speckit-specify`. Transform requirements into a formal `spec.md`.
3. 🔍 **Clarify** (Optional): Delegate to `speckit-clarify` if the specification is ambiguous.
4. 🏗️ **Plan**: Delegate to `speckit-plan`. Derive technical design and implementation architecture.
5. 📋 **Tasks**: Delegate to `speckit-tasks`. Break the plan into actionable task lists.
6. ⚖️ **Analyze** (Optional): Delegate to `speckit-analyze` for cross-artifact consistency.
7. 👷 **Implement**: Delegate to `speckit-implement`.
---
## 👷 Implementation Session Management
When executing the **`speckit-implement`** phase, you **MUST**:
- **Isolate Context**: Trigger a **new agent session** for implementation to ensure focus.
- **Dynamic Task Chunking**: Group tasks from `tasks.md` dynamically based on requirements and complexity.
- If tasks are small/simple, group 3-5 tasks (e.g., T001 to T005).
- If tasks are complex, group 1-2 tasks.
- **Sub-Agent Execution**: For each chunk, delegate to a sub-agent using `speckit-implement`.
- **Commit & Push**: After each successfully completed chunk, the sub-agent **MUST** commit and push the changes to the repository.
- **Mark Completion**: Ensure the sub-agent marks tasks as complete `[X]` in `tasks.md` before returning.
- **Avoid Over-grouping**: Do not group too many tasks in a single sub-agent session to maintain precision and manageable diffs.
---
## User Provided Context
```text
{{user_provided_context}}
```
Use this context to start or resume the workflow. If the project is not yet initialized, begin with **Step 1: Initialization**.